All schemes (excluding rural water supplies) |
Annual charge, invoiced quarterly
|
15 mm to 50 mm
|
787.92
|
80 mm to 150 mm
|
802.52
|
The above charges include an allowance of 380m3 of water per annum. Water use in excess of this will be separately charged. |
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters up to 50 mm
|
130.00
|
RPZ (Reduced Pressure Zone Protector) inspection and test fee for meters larger than 50 mm
|
199.00
|
Emergency meters water use per m3 (minimum charge of $20.00 applies when water is used)
|
6.07
|
Service restriction due to account issues (disconnect and reconnect) |
Remove or replace flow restrictor
|
441.00
|
Water Filling Stations |
Water use per m3 |
3.25
|
Feilding Water |
Connection fee | |
- New connection to property boundary plus MDC administration fee
|
As charged by contractor
|
- MDC administration fee
|
331.00
|
Meter installation cost in addition to manifold costs - sizes up to 20 mm
|
369.00
|
Meter installation cost in addition to manifold costs - sizes greater than 20 mm
|
Individual quote
|
Disconnection - pipe diameter up to 20 mm
|
527.00
|
Disconnection - pipe diameter over 20 mm
|
Individual quote
|
Himatangi Beach Water Scheme |
Connection fee | |
- New connection to property boundary plus MDC administration fee
|
As charged by contractor
|
- MDC administration fee
|
332.00
|
Disconnection
|
527.00
|
Rongotea Water Scheme |
Connection fee
|
1,499.00
|
Disconnection
|
527.00
|
Meter installation cost in addition to manifold costs - sizes up to 20 mm
|
Individual quote
|
Meter installation cost in addition to manifold costs - sizes greater than 20 mm
|
Individual quote
|
Sanson Water Scheme |
Connection fee
|
1,499.00
|
Disconnection
|
527.00
|
Remove or replace flow restrictor
|
439.00
|
Increase or decrease water allocation
|
439.00
|
Stanway/Halcombe Rural Water Scheme |
Connection fee (owner pays all pipe work)
|
1,499.00
|
Disconnection
|
530.00
|
Remove or replace flow restrictor
|
439.00
|
Increase or decrease water allocation
|
439.00
|
Waituna West Rural Water Scheme |
Connection fee (owner pays all pipe work)
|
1,499.00
|
Disconnection
|
527.00
|
Remove or replace flow restrictor
|
439.00
|
Increase or decrease water allocation
|
439.00
|
Ohakea Rural Water Scheme |
Connection fee (owner pays all pipe work)
|
1,499.00
|
Disconnection
|
527.00
|
Remove or replace flow restrictor
|
439.00
|
Increase or decrease water allocation
|
439.00
|
Capital Contributions - Units of Demand | |
Feilding Water - where development contribution is not charged
|
9,051.00
|
Himatangi Beach Water Scheme
|
9,051.00
|
Ohakea Rural Water Scheme
|
13,640.00
|
Rongotea Water Scheme
|
9,051.00
|
Sanson Water Scheme
|
9,051.00
|
Stanway Halcombe Rural Water Scheme
|
5,783.00
|
Waituna West Rural Water Scheme
|
6,686.00 |